Day 94 – February 2, 2011

We don’t have a very long driveway or sidewalk but with 2 inches of ice covering every square foot, it was a task to break it free from winter’s grip.

The slop of our drive makes getting to the garage a challenge in winter conditions.  This was especially true with the glazing we received Tuesday night. 

With industrial scraper tile scraper, a garden spade and two shovels we were able to get the job done in a little more than three hours. 

If it weren’t for the multiple falls on the ice and the break for lunch, we could have been done a lot sooner.  I have a feeling I’ll be a little sore tomorrow.

Leave a Reply

Your email address will not be published. Required fields are marked *